PUBLICATIONS

BOOKS

[1]               A. Shtub, J.F. Bard and S. Globerson (2005), Project Management: Processes, Methodologies, and Economics, Prentice Hall, Upper Saddle River, NJ. http://vig.prenhall.com/catalog/academic/product/0,1144,0130413313,00.html

 

[2]               P.A. Jensen and J.F. Bard (2003), Operations Research: Models and Methods, John Wiley & Sons, New York.  http://www.ormm.net/

http://he-cda.wiley.com/WileyCDA/HigherEdTitle/productCd-0471380040.html

 

[3]               J. Keogh, A. Shtub, J.F. Bard and S. Globerson (2000), Project Planning and Implementation, Pearson, Boston.

 

[4]               J.F. Bard (1998), Practical Bilevel Optimization: Algorithms and Applications, Kluwer Academic Publishers, Boston. http://www.wkap.nl/prod/b/0-7923-5458-3

 

[5]               K. Shimizu, Y. Ishizuka and J.F. Bard (1997), Nondifferentiable and Two-Level Programming, Kluwer Academic Publishers, Boston.

http://www.wkap.nl/prod/b/0-7923-9821-1

 

[6]               A. Shtub, J.F. Bard and S. Globerson (1994), Project Management: Engineering, Technology and Implementation, Prentice Hall, Englewood Cliffs, NJ.

http://vig.prenhall.com/catalog/academic/product/0,4096,0135564581,00.html

 

[7]               J.F. Bard (1975), Economic Principles of Remote Sensing Systems: Costs and Benefits, Allyn and Bacon, Boston.

 

BOOK CHAPTERS

[8]               J.F. Bard (2005). Project Scheduling. in Handbook of Industrial & Systems Engineering, A. Badiru (ed.), Chapter 4, pp. 4.1-4.46, CRC Press, Boca Raton, FL.

 

[9]               J.F. Bard (2001). Bilevel Linear Programming: Formulation and Properties. in Encyclopedia of Optimization, P.M. Pardalos and C.A. Floudas (eds.), Chapter 8, pp. 137-140, Kluwer Academic Publishers, Amsterdam.

 

[10]            J.F. Bard (2001). Bilevel Linear Programming: Complexity and Equivalence to Minmax Problem. in Encyclopedia of Optimization, P.M. Pardalos and C.A. Floudas (eds.), Chapter 9, pp. 140-144, Kluwer Academic Publishers, Amsterdam.

 

[11]            J.F. Bard (2001). Bilevel Programming in Management. in Encyclopedia of Optimization, P.M. Pardalos and C.A. Floudas (eds.), Chapter 17, pp. 173-177, Kluwer Academic Publishers, Boston.

 

[12]            J.F. Bard (1998). Conceptual Design and Analysis of Rail Car Unloading Area. in Industrial Applications of Combinatorial Optimization, G. Yu (ed.), pp. 272-300, Kluwer Academic Publishers, Boston.

 

[13]            J.F. Bard, J. Plummer and J.C. Sourie (1998). Determining Tax Credits for Converting Nonfood Crops to Biofuels: An Application of Bilevel Programming. in Multilevel Optimization: Algorithms and Applications, A. Migdalas, P.M. Pardalos, P. Värbrand (eds.), pp. 23-50, Kluwer Academic Publishers, Boston.

 

[14]            M. Argüello, J.F. Bard and G. Yu (1998). Models and Methods for Managing Airline Irregular Operations. in Operations Research in the Airline Industry, G. Yu (ed.), pp. 1-45, Kluwer Academic Publishers, Boston.

 

[15]            J.F. Bard (1989). Optimizing the R&D Portfolio. in Early Warning Signals for R&D Projects, R. Balachandra, Chapter 6, pp. 107-121, Lexington Books, D.C. Heath and Company, Lexington, Mass.

 

[16]            J.F. Bard (1986). The Evolution of Robotics in Manufacturing. in Modelling and Design of Flexible Manufacturing Systems, A. Kusiak (ed.), pp. 33-63, Elsevier Science Publishing Co., Amsterdam.

 

JOURNALS

[17]            J.F. Bard and L. Wan (2008). Workforce Design with Movement Restrictions between Workstation Groups. Manufacturing and Service Operations Management 40(1), 24-42.

 

[18]            J.F. Bard and D.N. Mohan (2008). Reallocating Arrival Slots during a Ground Delay Program. Transportation Research, Part B: Methodological 42(2), 113-134.

 

[19]            S. Monkman, D. Morrice and J.F. Bard (2008). A Production Scheduling Heuristic for an Electronics Manufacturer with Sequence Dependent Setup Costs. European Journal of Operational Research 187(3), 1100-1114.

 

[20]            J.F. Bard and H.W. Purnomo (2007). Cyclic Preference Scheduling of Nurses Using a Lagrangian-Based Heuristic. Journal of Scheduling 10(1), 5-23.

 

[21]            G. Zhu, J.F. Bard and G. Yu (2007). A Two-Stage Stochastic Programming Approach for Project Planning with Uncertain Activity Durations. Journal of Scheduling 10(3), 167-180.

 

[22]            J.F. Bard, D.P. Morton and Y.M. Wang (2007). Workforce Planning at USPS Mail Processing & Distribution Centers Using Stochastic Optimization. Annals of Operations Research 155(1), 51-78.

 

[23]            L. Wan and J.F. Bard (2007). Weekly Staff Scheduling with Workstation Group Restrictions. Journal of the Operational Research Society 58(8), 1030-1046.

 

[24]            H.W. Purnomo and J.F. Bard (2007). Cyclic Preference Scheduling for Nurses Using Branch and Price. Naval Research Logistics 54(2), 200-220.

 

[25]            J.F. Bard and H.W. Purnomo (2006). Incremental Changes in the Workforce to Accommodate Changes in Demand. Health Care Management Science 9(1), 71-85.

 

[26]            J.F. Bard and L. Wan (2006). The Task Assignment Problem for Unrestricted Movement between Workstation Groups. Journal of Scheduling 9(4), 315-342.

 

[27]            G. Zhu, J.F. Bard and G. Yu (2006). A Branch-and-Cut Procedure for the Multimode Resource Constrained Project Scheduling Problem. INFORMS Journal on Computing 18(3), 377-390.

 

[28]            X. Qi, J.F. Bard and G. Yu (2006). Disruption Management for Machine Scheduling: The Case of SPT Schedules. International Journal of Production Economics 103(1), 166-184.

 

[29]            J.F. Bard and S. Rojanasoonthon (2006). A Branch & Price Algorithm for Parallel Machine Scheduling with Time Windows and Job Priorities. Naval Research Logistics 53(1) 24-44.

 

[30]            X. Zhang and J.F. Bard (2006). A Multi-Period Machine Assignment Problem. European Journal of Operational Research 170(2), 398-415.

 

[31]            X. Qi and J.F. Bard (2006). Generating Labor Requirements and Rosters for Mail Handlers Using Simulation and Optimization. Computers & Operations Research 33(9), 2645-2666.

 

[32]            X. Zhang and J.F. Bard (2006). Comparative Approaches to Equipment Scheduling in High Volume Factories. Computers & Operations Research 33(1), 132-157.

 

[33]            J.F. Bard and H.W. Purnomo (2005). Hospital-Wide Reactive Scheduling of Nurses with Preference Considerations. IIE Transactions on Operations Engineering 37(7), 589-608.

 

[34]            J.F. Bard and L. Wan (2005). Weekly Scheduling in the Service Industry: An Application to Mail Processing & Distribution Centers. IIE Transactions on Scheduling & Logistics 37(5), 379-396.

 

[35]            J.F. Bard and H.W. Purnomo (2005). Short-Term Nurse Scheduling in Response to Daily Fluctuations in Supply and Demand. Health Care Management Science 8(4), 315-324.

 

[36]            J. F. Bard and H.W. Purnomo (2005). A Column Generation-Based Approach to Solve the Preference Scheduling Problem for Nurses with Downgrading. Socio-Economic Planning Sciences 39(3), 193-213.

 

[37]            J.F. Bard and H.W. Purnomo (2005). Preference Scheduling For Nurses Using Column Generation. European Journal of Operational Research 164(2), 510-534.

 

[38]            X. Zhang and J.F. Bard (2005). Equipment Scheduling at Mail Processing and Distribution Centers. IIE Transactions on Scheduling & Logistics 37(2), 175-187.

 

[39]            G. Zhu, J.F. Bard and G. Yu (2005). Disruption Management for Resource-Constrained Project Scheduling. Journal of the Operational Research Society 56, 365-381.

 

[40]            S. Rojanasoonthon and J.F. Bard (2005). A GRASP for Parallel Machine Scheduling with Time Windows. INFORMS Journal on Computing 17(1), 32-51.

 

[41]            X. Qi, J.F. Bard and G. Yu (2004). Class Scheduling for Pilot Training. Operations Research 52(1), 148-162.

 

[42]            J.F. Bard (2004). Staff Scheduling in High Volume Service Facilities with Downgrading. IIE Transactions on Scheduling & Logistics 36(10), 985-997.

 

[43]            J.F. Bard (2004). Selecting the Appropriate Input Data Set When Configuring a Permanent Workforce. Computers & Industrial Engineering 47(4), 371-389.

 

[44]            X. Qi, J.F. Bard and G. Yu (2004). Supply Chain Coordination with Demand Disruptions. Omega 32(4), 301-312.

 

[45]            R.Z. Rios-Mercado and J.F. Bard (2003). The Flowshop Scheduling Polyhedron with Setup Times. Journal of Combinatorial Optimization 7(3) 291-318.

 

[46]            S. Rojanasoonthon, J.F. Bard and S.D. Reddy (2003). Algorithms for Parallel Machine Scheduling: A Case Study of the Tracking and Data Relay Satellite System. Journal of the Operational Research Society 54(8), 806-821.

 

[47]            B.G. Thengvall, J.F. Bard and G. Yu and (2003). A Bundle Algorithm for the Aircraft Schedule Recovery Problem During Hub Closures. Transportation Science 37(4), 392-407.

 

[48]            J.F. Bard, C. Binici and A.H. deSilva (2003). Staff Scheduling at the United States Postal Service. Computers & Operations Research 30(5), 745-771.

 

[49]            P. Jaillet, J.F. Bard, L. Huang and M. Dror (2002). Delivery Cost Approximations for Inventory Routing Problems in a Rolling Horizon Framework. Transportation Science 36(3), 292-300.

 

[50]            J.F. Bard, G. Kontoravdis and G. Yu (2002). A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows. Transportation Science 36(2), 250-269.

 

[51]            X. Qi, G. Yu and J.F. Bard (2002). Single Machine Scheduling with Variable Due Dates. Discrete Applied Mathematics 122(1-3), 211-233.

 

[52]            S. Dempe and J.F. Bard (2001). A Bundle Trust-Region Algorithm for Bilinear Bilevel Programming. J. Optimization Theory and Applications 110(2), 265-288.

 

[53]            B.G. Thengvall, G. Yu and J.F. Bard (2001). Multiple Fleet Aircraft Schedule Recovery Following Hub Closure. Transportation Research, Part A: Policy and Practice 35(4), 289-308.

 

[54]            J.F. Bard, G. Yu and M.F. Argüello (2001). Optimizing Aircraft Routings in Response to Groundings and Delays. IIE Transactions on Operations Engineering 33(10), 931-947.

 

[55]            J.F. Bard, J. Plummer and J.C. Sourie (2000). A Bilevel Programming Approach to Determining Tax Credits for Biofuel Production. European Journal of Operational Research 120(1), 30-46.

 

[56]            B.G. Thengvall, J.F. Bard and G. Yu (2000). Balancing User Preferences for Aircraft Schedule Recovery during Airline Irregular Operations. IIE Transactions on Operations Engineering 32(3), 181-193.

 

[57]            J.F. Bard, K. Srinivasan and D. Tirupati (1999). An Optimization Approach to Capital Expansion in Semiconductor Manufacturing. International Journal of Production Research 37(15), 3359-3382.

 

[58]            R.Z. Rios-Mercado and J.F. Bard (1999). A Branch-and-Bound Algorithm for Flowshop Scheduling with Setup Times. IIE Transactions on Scheduling & Logistics 31(8), 721-731.

 

[59]            R.Z. Rios-Mercado and J.F. Bard (1999). An Enhanced TSP-Based Heuristic for Makespan Minimization in a Flow Shop with Setup Times. Journal of Heuristics 5(1), 53-70.

 

[60]            J.F. Bard, L. Huang, P. Jaillet and M. Dror (1998). A Decomposition Approach to the Inventory Routing Problem with Satellite Facilities. Transportation Science 32(2), 189-203.

 

[61]            J.F. Bard, L. Huang, M. Dror and P. Jaillet (1998). A Branch and Cut Algorithm for the VRP with Satellite Facilities. IIE Transactions on Operations Engineering 30(9), 821-834.

 

[62]            R.Z. Rios-Mercado and J.F. Bard (1998). Computational Experience with a Branch-and-Cut Algorithm for Flowshop Scheduling with Setup Times. Computers & Operations Research 25(5), 351-366.

 

[63]            R.Z. Rios-Mercado and J.F. Bard (1998). Heuristics for the Flow Line Problem with Setup Costs. European Journal of Operational Research 110(1), 76-98.

 

[64]            M.F. Argüello, J.F. Bard and G. Yu (1997). A GRASP for Aircraft Routing in Response to Groundings and Delays. Journal on Combinatorial Optimization 1(3), 211-228.

 

[65]            J.F. Bard (1997). An Analysis of a Rail Car Unloading Area for a Consumer Products Manufacturer. Journal of the Operational Research Society 48(9) 873-883.

 

[66]            J.F. Bard (1997). Benchmarking Simulation Software for Use in Modeling Postal Operations. Computers & Industrial Engineering 32(3) 607-625.

 

[67]            O. Goldschmidt, J.F. Bard and A. Takvorian (1997). Complexity Results for Mixed-Model Assembly Lines with Approximation Algorithms for the Single Station Case. International J. Flexible Manufacturing Systems 9(3) 251-272.

 

[68]            J.F. Bard, A.H. deSilva and A. Bergevin (1997). Evaluating Simulation Software for Postal Service Use: Technique versus Perception. IEEE Transactions on Engineering Management 44(1) 31-42.

 

[69]            T.A. Feo, J.F. Bard and S.D. Holland (1996). A GRASP for Scheduling Printed Wiring Board Assembly. IIE Transactions on Scheduling & Logistics 28(2), 155-164.

 

[70]            T.A. Feo, J.F. Bard and S.D. Holland (1995). Facility Wide Scheduling of Printed Wiring Board Assembly. Operations Research 43(2), 219-230.

 

[71]            J.K. Robinson, J.W. Fowler and J.F. Bard (1995). The Use of Upstream and Down Stream Information in Scheduling Semiconductor Batch Operations. International Journal of Production Research 33(7), 1849-1869.

 

[72]            J.F. Bard, T.A. Feo and S.D. Holland (1995). Reengineering and the Development of a Decision Support System for Printed Wiring Board Assembly. IEEE Transactions on Engineering Management 42(1), 91-98.

 

[73]            G. Kontoravdis and J.F. Bard (1995). A GRASP for the Vehicle Routing Problem with Time Windows. ORSA Journal on Computing 7(1), 10-23.

 

[74]            D. J. Crowley, J.F. Bard and P.A. Jensen (1995). Using Flow Ratio Analysis and Discrete Event Simulation to Design a Medium Volume Production Facility. Computers & Industrial Engineering 28(2), 379-397.

 

[75]            A.I.Z. Jarrah, J.F. Bard and A.H. deSilva (1994). Solving Large-Scale Tour Scheduling Problems. Management Science 40(9), 1124-1144.

 

[76]            A.I.Z. Jarrah, J.F. Bard and A.H. deSilva (1994). Equipment Selection and Machine Scheduling in General Mail Facilities. Management Science 40(8), 1049-1068.

 

[77]            J.F. Bard, A. Shtub and S.B. Joshi (1994). Sequencing Mixed-Model Assembly Lines to Level Parts Usage and Minimize Line Length. International Journal of Production Research 32(10), 2431-2454.

 

[78]            J.F. Bard, R. Clayton and T.A. Feo (1994). Machine Setup and Component Insertion for Printed Circuit Board Assembly. International Journal of Flexible Manufacturing Systems 6(1), 5-31.

 

[79]            J.F. Bard, A.H. deSilva and T.A. Feo, S.D. Wert (1993). Design of Semi-Automated Mail Processing Facilities. IIE Transaction on Design & Manufacturing 25(4), 88-101.

 

[80]            J.F. Bard, K. Venkatraman and T.A. Feo (1993). Single Machine Scheduling with Flow Time and Earliness Penalties. Journal of Global Optimization 3, 289-309.

 

[81]            J.F. Bard and A. Graham (1993). Developing a Data Collection System for PCB Assembly: A Case Study in Software Engineering. IEEE Transactions on Engineering Management 40(2), 191-202.

 

[82]            J.F. Bard (1992). A Comparison of the Analytic Hierarchy Process with Multiattribute Utility Theory: A Case Study. IIE Transactions 24(5), 111-121.

 

[83]            A.I.Z. Jarrah, J.F. Bard and A.H, deSilva (1992). A Heuristic for Machine Scheduling at General Mail Facilities. European Journal of Operational Research 63(2)192-206.

 

[84]            S.B. Graves, J.L. Ringuest and J.F. Bard (1992). Recent Developments in Screening Methods for Nondominated Solutions in Multiobjective Optimization. Computers & Operations Research 19(7), 683-694.

 

[85]            J.F. Bard and J.T. Moore (1992). An Algorithm for the Discrete Bilevel Programming Problem. Naval Research Logistics 39 419-435.

 

[86]            T.A. Edmunds and J.F. Bard (1992). An Algorithm for the Mixed-Integer Nonlinear Bilevel Programming Problem. Annuals of Operations Research 34 149-162.

 

[87]            J.F. Bard, E. Dar-El and A. Shtub (1992). An Analytic Framework for Sequencing Mixed Model Assembly Lines. International Journal of Production Research 30(1), 35-48.

 

[88]            S.D. Wert, J.F. Bard, A.H. deSilva and T.A. Feo (1991). A Simulation Analysis of Semi-Automated Mail Processing Facilities. Journal of the Operational Research Society 42(12), 1071-1086.

 

[89]            T.A. Feo, K. Venkatraman and J.F. Bard (1991). A GRASP for a Difficult Single Machine Scheduling Problem. Computers & Operations Research 18(8), 635-643.

 

[90]            J.F. Bard and W.A. Bejjani (1991). Designing Telecommunications Networks for the Reseller Market. Management Science 37(9), 1125-1146.

 

[91]            J.F. Bard and B. Golany (1991). Determining the Number of Kanbans in a Multiproduct, Multistage Production System. International Journal of Production Research 29(5), 881-895.

 

[92]            T.A. Edmunds and J.F. Bard (1991). Algorithms for Nonlinear Mathematical Bilevel Programs. IEEE Trans. Systems, Man, and Cybernetics 21(1), 83-89.

 

[93]            J.F. Bard and J.E. Bennett  (1991). Arc Reduction and Path Preference in Stochastic Acyclic Networks. Management Science 37(2), 198-215.

 

[94]            J.F. Bard and T.A. Feo (1991). An Algorithm for the Manufacturing Equipment Selection Problem. IIE Transactions 23(1), 83-92. 

 

[95]            J.F. Bard (1991). Some Properties of the Bilevel Programming Problem. J. Optimization Theory and Applications 68(2), 371-378.

 

[96]            J.T. Moore and J.F. Bard (1990). The Mixed Integer Linear Bilevel Programming Problem. Operations Research 38(5), 911-921.

 

[97]            T.A. Edmunds and J.F. Bard (1990). A Time Axis Decomposition Technique for Large Scale Optimal Control Problems. J. Optimization Theory and Applications 67(2), 259-277.

 

[98]            J.F. Bard (1990). Using Multicriteria Methods in the Early Stages of New Product Development. Journal of the Operational Research Society 41(8) 755-766.

 

[99]            J.F. Bard and S. Sousk (1990). A Tradeoff Analysis for Rough Terrain Cargo Handlers Using the AHP: An Example of Group Decision Making. IEEE Transactions on Engineering Management EM-37(3), 222-228.

 

[100]        J.F. Bard and J.T. Moore (1990). A Branch and Bound Algorithm for the Bilevel Programming Problem. SIAM Journal on Scientific and Statistical Computing 11(2) 281-292.

 

[101]        J.F. Bard and