University of Texas Navigation
 

MANUFACTURING VIEW

Students | Awards | Publications | Presentations | Grants | Sponsors Collaborators | Other Links


UNIVERSITY OF TEXAS AT AUSTIN:

Yiwei Cai, Ph.D. in progress
1 semester into the program, will take the qualifier in August, working on the Disruption Management in Semiconductor Manufacturing project, co-supervised with J. Qin in Chemical Engineering. Should graduate by December 2007.

Clare Schoen, Ph.D. in progress
A Chemical Engineering student, co-supervised with J. Qin in Chemical Engineering. Should graduate by December 2007.

Michael Nehme, Ph.D. in progress
In his second semester in the program, will take the qualifier in August, working on Proactive Planning and Scheduling in Semiconductor Manufacturing (AMD-supported project). Should graduate by May 2008.

resume

Emrah Zarifoglu, Ph.D. in progress
In his second semester in the program, will take the qualifier in August, working on the Scope of Scheduling in Semiconductor Manufacturing (AMD-supported project). Should graduate by May 2008.


M.S. Students

Other Student Advising
back to top


NSF CAREER Award, 2002-2007, NSF.
Summer Research Award, 2004, the University of Texas at Austin.
Graduate Scholarship, 1995-1999, Department of ISE, Lehigh University.
Graduate Scholarship, 1992-1994, Bilkent University, Ankara, Turkey.
Undergraduate Scholarship, 1987-1992, Bilkent University, Ankara, Turkey.

back to top


Book In Preparation Invited Book Chapter in Preparation Refereed Journal Papers, published or accepted for publication
  1. E. Kutanoglu and S.D. Wu (2006) "Incentive Compatible, Collaborative Production Scheduling with Simple Communication among Distributed Agents," International Journal of Production Research, Vol 44, No. 3, 421-446. Long Version
  2. C.R. Cassady and E. Kutanoglu (2005) "Integrating Preventive Maintenance Planning and Production Scheduling for a Single Machine," IEEE Transactions on Reliability, Vol. 54, No. 2, 304-309. Long Version
  3. E. Kutanoglu and S.D. Wu (2004), "Improving Schedule Robustness via Preprocessing and Dynamic Adaptation," IIE Transactions, Vol. 36, No. 11, 1107-1124. Research Summary in Industrial Engineer Magazine | Long Version
  4. C.R. Cassady and E. Kutanoglu (2003), "Minimizing Job Tardiness using Integrated Preventive Maintenance Planning and Production Scheduling," IIE Transactions, Vol. 35, No. 6, 503-513. Research Summary in Industrial Engineer Magazine | Long Version
  5. E. Kutanoglu and I. Sabuncuoglu (2001), "Routing based reactive scheduling policies for machine failures in dynamic job shops," International Journal of Production Research, Vol. 39, No. 14, 3141-3158. Long Version
  6. E. Kutanoglu and I. Sabuncuoglu (2001), "Experimental Investigation of Iterative Simulation-Based Scheduling in Dynamic and Stochastic Job Shops," Journal of Manufacturing Systems, Vol. 20, No. 4, 264-279. Long Version
  7. E. Kutanoglu and S.D. Wu (1999), "On Combinatorial Auction and Lagrangean Relaxation for Distributed Resource Scheduling," IIE Transactions, Vol. 31, No. 9, 813- 826. Long Version
  8. E. Kutanoglu and I. Sabuncuoglu (1999), "An Analysis of Heuristics in a Dynamic Job Shop withWeighted Tardiness Objectives," International Journal of Production Research, Vol. 37, No. 1, 165-187. Long Version
Refereed Conference Proceedings, published or accepted
  1. S.J. Mason, E. Kutanoglu, J.W. Fowler (2005) "Manufacturing and Logistics Applications of Multiple Orders Per Job Scheduling," Proceedings of 14th Industrial Engineering Research Conference, IIE, Atlanta, GA.
  2. F. Tanrisever, E. Kutanoglu, and S.J. Mason (2004), "Forming and Scheduling Jobs from Multiple Orders with Different Attributes: A Computational Study of Special Cases," Proceedings of 13th Industrial Engineering Research Conference, IIE, Houston, TX.
  3. P. Qu, S.J. Mason, E. Kutanoglu and J.W. Fowler (2004), "A Polynomial Time Heuristic for Scheduling Multiple-Order Jobs on a Single Machine," Proceedings of 13th Industrial Engineering Research Conference, IIE, Houston, TX.
  4. R. Ling, E. Kutanoglu, and S.J. Mason (2003) "Scaling-based Algorithms for Resource Constrained Project Scheduling Problems," Proceedings of 12th Industrial Engineering Research Conference, IIE, Portland, OR.
  5. F. Tovia, C.R. Cassady, and E. Kutanoglu (2003), "Inventory Management through Information Sharing and Collaboration," 31st International Conference on Computers and Industrial Engineering, San Francisco, California.
  6. F. Tovia, E. Kutanoglu, and and T. Collins (2002) "Throughput Analysis in a Frozen Food Processing Facility," Proceedings of 11th Industrial Engineering Research Conference, IIE, Orlando, FL.
  7. P. Qu, S.J. Mason, and E. Kutanoglu (2001) "Scheduling jobs containing multiple orders," Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing, Phoenix, AZ.
  8. E. Kutanoglu and S.D. Wu (2001), "Lagrangian Relaxation-Based Techniques for Job Shop Scheduling," Proceedings of 10th Industrial Engineering Research Conference, IIE, Dallas, TX.
  9. E. Kutanoglu and S.D. Wu (2000), "Schedule Selection Game: A Game-Theoretic Analysis for Incentive Compatible Scheduling," Proceedings of 9th Industrial Engineering Research Conference, IIE, Cleveland, OH.
  10. E. Kutanoglu and I. Sabuncuoglu (1995), "An Investigation of Reactive Scheduling Policies under Machine Breakdowns," Proceedings of 4th Industrial Engineering Research Conference, IIE, Nashville, Tennessee, 1995.
  11. E. Kutanoglu and I. Sabuncuoglu (1994), "Experimental Investigation of Scheduling Rules in a Dynamic Job Shop with Weighted Tardiness Costs," Proceedings of 3rd Industrial Engineering Research Conference, IIE, Atlanta, Georgia, 1994.
Submitted, In review, Under revision
  1. S.J. Mason, P. Qu, E. Kutanoglu, and J.W. Fowler (2004) "The single machine multiple orders per job scheduling problem," Submitted to IIE Transactions, Revision 2.
  2. F. Tanrisever, and E. Kutanoglu (2005) "Forming and Scheduling Jobs with Capacitated Constraints in Semiconductor Manufacturing: Single Machine Problem," Submitted to Annals of Operations Research.
In Preparation for Journal Submission
  1. E. Kutanoglu and S.D. Wu "A Computational Study of Coalitions in Cooperative Multi-Agent Production Scheduling," In preparation for Production Planning and Control.
  2. F. Tanrisever and E. Kutanoglu "Forming and Scheduling Jobs with OrderWeights in Semiconductor Manufacturing," In preparation for Journal of Scheduling.
  3. E. Kutanoglu and S.D. Wu "Scaling-based Heuristics for Job Shop Scheduling under Deterministic and Stochastic Conditions," In preparation for Computers and Operations Research.
  4. E. Kutanoglu and S.D. Wu "Proactive Equilibrium: A New Equilibrium Concept for Distributed Resource Scheduling,"
  5. E. Kutanoglu and R. Ling "A Scaling-based Heuristic for Resource-Constrained Project Scheduling Problems,"
Theses, Dissertations, and Working Papers
back to top


  1. F. Tanrisever, and E. Kutanoglu (2005) "Job Formation and Scheduling in Semiconductor Manufacturing," INFORMS Annual Meeting, San Francisco, CA.
  2. Y. Cai, E. Kutanoglu, and J. Hasenbein (2005) "Optimization-based Semiconductor Manufacturing Scheduling," INFORMS Annual Meeting, San Francisco, CA.
  3. B. Bregenzer, E. Kutanoglu, J. Hasenbein, and J. Qin (2005) "Scheduling Practice in Semiconductor Manufacturing: Results of a Comprehensive Survey," INFORMS Annual Meeting, San Francisco, CA.
  4. E. Kutanoglu and F. Tanrisever (2005) "Forming and Scheduling Jobs with Order Weights in Semiconductor Manufacturing," 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications, MISTA 2005, New York, NY.
  5. J. Fowler, E. Kutanoglu, and S.J. Mason (2005) "Multiple Orders per Job Scheduling Problems," 2nd Multidisciplinary International Conference on Scheduling: Theory and Applications, MISTA 2005, New York, NY.
  6. E. Kutanoglu and F. Tanrisever (2004) "Job Formation and Scheduling Problem with Capacitated Containers," INFORMS Annual Meeting, Denver, CO.
  7. E. Kutanoglu and S.D. Wu (2002) "Distributed Scheduling, Mechanism Design, and Optimization," INFORMS Annual Meeting, San Jose, CA.
  8. E. Kutanoglu (2001) "Distributed Resource Scheduling via Complex Auctions," INFORMS International Meeting, Maui, Hawaii.
  9. E. Kutanoglu, C.R. Cassady and S.J. Mason (2001) "An Analysis of Integrating Production Scheduling and Preventive Maintenance Planning Decisions," INFORMS International Meeting, Maui, Hawaii.
  10. E. Kutanoglu (2000) "Improving Schedule Robustness via Stochastic Analysis and Dynamic Adaptation," Invited talk, Graduate Seminar Series, Bilkent University, Ankara, Turkey.
  11. E. Kutanoglu and S.D. Wu (2000) "Incentive Compatible Distributed Scheduling," 21st National Operations Research and Industrial Engineering Conference, Fagamusta, Cyprus.
  12. E. Kutanoglu and S.D. Wu (1999) "Proactive Equilibrium for Distributed Job Shop Scheduling", INFORMS Fall Meeting, Philadelphia, PA.
  13. E. Kutanoglu and S.D. Wu (1999) "Improving Schedule Robustness via Stochastic Analysis and Dynamic Adaptation", INFORMS Spring Meeting, Cincinnati, OH.
  14. E. Kutanoglu (1999) "Distributed Resource Scheduling: Optimization Models, Equilibrium Conditions, and Incentive Compatible Mechanisms," Graduate Seminar Series, Department of Mechanical Engineering, University of Minnesota.
  15. E. Kutanoglu (1999) "Distributed Resource Scheduling: Optimization Models, Equilibrium Conditions, and Incentive Compatible Mechanisms," Graduate Seminar Series, Department of Industrial Engineering, University of Arkansas.
  16. E. Kutanoglu (1999) "Distributed Resource Scheduling: Optimization Models, Equilibrium Conditions, and Incentive Compatible Mechanisms," Graduate Seminar Series, Department of Industrial and Manufacturing Systems Engineering, Lehigh University.
  17. E. Kutanoglu and S.D.Wu (1998) "Distributed Resource Scheduling Using a Lagrangeanbased Decomposition," INFORMS Spring Meeting, Montreal, Canada.
  18. S.D. Wu and E. Kutanoglu (1997) "Distributed Resource Scheduling Using Auction and Lagrangean Relaxation," INFORMS Fall Meeting, Dallas, TX.
  19. E. Kutanoglu, J. Bustos and K. Zeithammer (1996) "Simulation Modeling at Bethforge, Inc.," Engineering Research for Industry Symposium, Society of Manufacturing Engineers, Lehigh University, Bethlehem, PA.
  20. E. Kutanoglu and I. Sabuncuoglu (1994) "Reactive Scheduling Policies against Machine Breakdowns in Dynamic Job Shops," 16thNational OR/IE Conference, Ankara, Turkey (in Turkish).
  21. E. Kutanoglu and I. Sabuncuoglu (1994) "Computational Testing of Weighted Tardiness Priority Rules in Dynamic Job Shop Setting," 16th National OR/IE Conference, Ankara, Turkey (in Turkish).
  22. V. Verter, A. Atamturk, S. Hosten, E. Kutanoglu (1991) "Practical Studies in Mainstream OR Journals in 1985-1991," 14th National OR/IE Conference, Istanbul, Turkey (in Turkish).
back to top


The University of Texas at Austin University of Arkansas
back to top


AMD
NSF (National Science Foundation)
Semiconductor Research Consortium (SRC)
SEMATECH
Dash Optimization
back to top


Informs
IIE
ORIE
Citeseer
UT INFORMS
back to top