Scheduling with Advanced Process Control Contraints
Y. Cai, J. J. Hasenbein, E. Kutanoglu, and S. J. Qin
With increasing worldwide competition, high technology manufacturing
companies have to pay great attention to lower their production
costs and guarantee high quality at the same time. Advanced
process control (APC) is widely used in semiconductor manufacturing
to adjust machine parameters so as to achieve satisfactory product
quality. When there is a conflict between quality and scheduling
objectives,
quality usually has to be satisfied. This paper studies the
interaction between scheduling and APC. A single-machine multiplejob-
types makespan problem with APC constraints is proved to be
NP-hard. For some special cases, optimal solutions are obtained
analytically.
In more general cases, the structure of optimal solutions
is explored. An efficient heuristic algorithm based on these structural
results is proposed and compared to an integer programming approach.